Deck maintenance and the planned maintenance system

The Chief Mate runs the deck department and is responsible for the upkeep of the hull, deck, rigging and deck equipment. This lesson covers deck maintenance and the planned maintenance system that keeps it under control.

Maintaining the deck and structure

The Chief Mate plans and supervises the maintenance of the hull and superstructure, the deck fittings, the paintwork and corrosion control, the rigging and lifting gear, the ground tackle and mooring equipment, and the watertight and weathertight closing appliances. On a yacht the standard of finish is high, but the underlying purpose is to keep the ship seaworthy and safe, not just presentable. Work is scheduled through a planned maintenance system driven by running hours and the calendar, with the work done and the defects found recorded.

  • Plan maintenance of hull, deck, rigging, lifting gear, ground tackle and closing appliances.
  • Run a planned maintenance system by running hours and calendar, recording work and defects.
  • Control corrosion through coatings, cathodic protection and keeping spaces clean and dry.
  • Manage stores and consumables so the work can actually be done.

NOTE — Plan the work, work the plan Management-level maintenance is about foresight: scheduling and resourcing work so that failures are prevented rather than chased. A planned maintenance system with honest records is what keeps the deck reliable.

WARNING — Presentation must not hide seaworthiness On a yacht the pressure is to keep everything looking perfect, but a fresh coat of paint over corroded steel or a frayed wire hidden behind a cover is a trap. Maintenance serves seaworthiness first, appearance second.

Practice questions

5 questions
recallcore

recall · core

A planned maintenance system is driven mainly by: (a) Waiting for things to break (b) Running hours and the calendar (maker's schedules) (c) Guesswork (d) The weather

recallcore

recall · core

On a yacht, a high standard of finish must never: (a) Be attempted (b) Hide a loss of seaworthiness such as corrosion or a frayed wire (c) Be recorded (d) Be planned

recallcore

recall · core

Corrosion is controlled by coatings, cathodic protection and: (a) Adding weight high (b) Keeping spaces clean and dry (c) Leaving bilges wet (d) Ignoring anodes

recallcore

recall · core

Maintenance work and defects found should be: (a) Kept in the mate's head (b) Recorded in the planned maintenance system (c) Never written down (d) Told only to guests

recallcore

recall · core

The Chief Mate's maintenance responsibility covers the: (a) Engine internals (b) Hull, deck, rigging, lifting gear, ground tackle and closing appliances (c) Galley menu (d) Radio licence