Guests leave at 1000 and a new group boards at 1600. In between: eight cabins to strip and turn, a full laundry cycle, provisioning coming aboard, a florist at the passerelle, two crew on their first turnaround and a chief officer who wants the crew mess cleared for a contractor. You have three people and six hours. What you do in the next ten minutes decides whether this works.
Task and workload management
Workload management is the core of the STCW leadership competences and of Unit 17: plan, prioritise, allocate resources, and monitor. It is a cycle, not a single act.
- Plan: list every task and its true duration. Interior crew habitually underestimate laundry and overestimate their own speed.
- Prioritise: rank by consequence of failure and by dependency, not by what is nearest.
- Allocate: match the task to the person by competence, not by who is free.
- Monitor: check progress against time at agreed points, and re-plan out loud when reality changes.
A prioritisation grid that works onboard
| Urgent | Not urgent | |
|---|---|---|
| High consequence | Do now, yourself or with your best person: guest safety, allergy checks, cabins for arrival | Schedule and protect: training, deep cleans, inventory, appraisals |
| Low consequence | Delegate or batch: flowers, polishing, minor set-ups | Drop it, or park it for the yard period |
The classic HOD error is spending the turnaround in the "urgent, low consequence" box because it is visible and satisfying, while nobody has checked the arrival cabins.
Bottlenecks and dependencies
Find the constraint. In most turnarounds it is the laundry machine cycle time — nothing you do elsewhere shortens it, so it must start first and everything else is sequenced around it. Identify the critical path, start it immediately, and do not let a lower-priority task block it.
Recognising overload — in others
- Work rate drops but effort rises; the same task takes twice as long.
- Tunnel vision on one task while others are dropped.
- Short answers, no questions asked, checklists skipped.
- Small, uncharacteristic errors: wrong cabin, wrong glass, forgotten step.
The response is not encouragement. It is to reduce the load: remove a task, add a person, extend a deadline, or lower a non-safety standard deliberately and say so.
Recognising overload — in yourself
You are the last to notice. The warning signs are irritability, a refusal to delegate, doing tasks instead of leading, and dropping the brief because "there is no time". If you cannot spare four minutes to brief, you are overloaded and the department is about to make an error. Stop, re-plan, and tell the Chief Officer if the schedule is genuinely undeliverable.
Onboard Notes
- Saying "we cannot do all of this safely in six hours" to the Master or Chief Officer early is professional. Saying it at 1550 is not.
- Never solve a workload problem by quietly breaking rest hours. Escalate instead; the schedule is a management problem, not a personal endurance test.
- Write the plan down and put it where the team can see it. A plan that exists only in the HOD head cannot survive the HOD being called away.